• <kbd id="disgu"></kbd>
      <kbd id="disgu"></kbd>
    • <meter id="disgu"><span id="disgu"><center id="disgu"></center></span></meter>
      精品少妇人妻av无码专区,国产最近最新中文天堂,激情综合色综合久久丁香,亚洲欧洲日韩综合,亚洲午夜久久久久久久久久 ,亚洲公开免费在线视频,中文字幕有码高清日韩,亚洲男同GV在线观看
      您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

      服務熱線

      當前位置: 首頁- 新聞中心 > 客戶見證
      常見問題
      新聞中心

      高低壓成套設備安裝要注意什么?

      發布時間:2023-04-28 來源:http://m.cnchaoda.com/ 瀏覽量:

      1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
      During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
      2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
      2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinets can be fixed to the wall with expansion bolts, but hollow bricks or dovetail bolts should be embedded in the block wall or fixed with square head bolts. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
      3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
      電氣成套
      3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
      4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
      4. Connect the top of the distribution cabinet to the busbar, and pay attention to tightening the busbar matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
      5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
      After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
      6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
      6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
      首頁首頁 產品產品 電話電話 置頂置頂
      主站蜘蛛池模板: 国产极品美女高潮无套| 饥渴的熟妇张开腿呻吟视频| 久久综合色之久久综合| 中国丰满熟妇xxxx| 日本中文一区二区三区亚洲| 国产一区二区三中文字幕| 久久久久国产精品人妻电影| 青青草一区| 国产成人无码一区二区三区| 国产一卡在线观看完整版| 国产美女丝袜高潮白浆| 中文字幕无码av不卡一区| 国产中文aⅴ在线| 精品国产成人国产在线视| 日韩精品一区二区三区| 国产韩国日本精品一区| 伊人久久大香线蕉综合5g| 国产精品无码久久久一区蜜臀| 久久久精品人妻一区二区三区综合| 久久99国产精品久久99果冻传媒| 亚洲男人的天堂久久香蕉网| 国产精品福利一区二区久久| 欧美午夜在线观看| 亚洲欧美人成视频一区在线| 上面膜下边吃的视频| 国产精品护士| 在教室伦流澡到高潮h麻豆| 久操加勒比视频在线观看| 中文AV怡红院| 精品人妻无码区二区三区| 欧美亚洲国产精品久久久久| 97久久久久人妻精品区一| 91美女视频在线| 精品人妻一区二区三区蜜臀| 国产成人精品第一区二区| 久久久久亚洲精品无码网址| 久久99精品久久久久久秒播| 亚洲性啪啪无码av天堂| 亚洲香蕉视频综合在线| 一个人看的视频在线| 日韩人妻无码精品—专区|